Construction method×大阪ガスリノテック - メーカー・企業と製品の一覧

Construction methodの製品一覧

1~1 件を表示 / 全 1 件

表示件数

ASL II Method

Achieving the reduction of indoor work! Since immediate restoration and water supply can be done on the same day, troublesome temporary water supply is unnecessary.

The "ASL II Method" is a reliable system that allows for one-day construction and same-day water supply. By the evening of the same day, all faucets are usable, so requests for residents to stay at home can be completed in one day. There are no missed spots or pipe blockages, and a smooth lining without pinholes is possible. Since restoration and water supply can be done on the same day, troublesome temporary water supply is unnecessary. 【Features】 ■ One-day construction and same-day water supply ■ Requests for residents to stay at home can be completed in one day ■ Smooth lining without pinholes is possible ■ Troublesome temporary water supply is unnecessary ■ A highly reliable water supply pipe rehabilitation method developed based on gas pipe lining technology *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録